MANUFACTURE AND SUPPLY OF PIPELINE PARTS FOR KHMELNYTSKYI NPP
The Company has signed a contract with Energoatom NNEGC SOE’s SS Khmelnytskyi NPP for the manufacture and supply of parts, elements and assembly components for group C pipelines under PNAE G-008-89 for use in the NPP’s safety-critical systems.
Fulfilment of the Contract will be ensured through the Company’s production facilities, using the method of cold deformation of pipe billets with subsequent thermal tempering and testing, as required under SOU NNEGC.
Another order, placed with the Company after bidding in public procurements by Energoatom NNEGC, testifies to the high standards of quality of its products. manufactured using advanced technologies implemented by the Company on the basis of state-of-the-art press and hydroforming equipment.
Customer: Energoatom NNEGC SOE’s SS Khmelnytskyi NPP